Program Documents/Reports
Note: Some reports, although portioned into
manageable sizes are still quite large and may take some time to download
- depending on your download speed.
General
Draft Annual Technical Report for Spring 2010 Interim Flows - August 6, 2010
Final Environmental Assessment and signed Finding of No Significant Impact for the Recirculation of Recaptured Water Year 2010 San Joaquin River Restoration Program Interim Flows, July 23, 2010
Draft Environmental Assessment and Draft Finding of No Significant Impact for the Recirculation of Recaptured 2010 San Joaquin River Restoration Program Interim Flows, June 28, 2010
Comments due by 5 p.m. Friday, July 16, 2010
Draft Supplemental Environmental Assessment and Proposed Finding of No Significant Impact for the SJRRP's Water Year 2011 Interim Flows Project - June 11, 2010
Part III Notice and Guidelines for the Application of Criteria for Financial Assistance for Local Projects - March 2010
Draft Annual Technical Report for fall 2009 Interim Flows - February 2010
Appendix A - Problems Statements
Appendix B - Surface Water Stage and Flows Data
Appendix C - Surface Water Quality
Appendix D - Sediment
Appendix E - Groundwater Data
Appendix F - Dathymetric Surveys
Appendix G - Meso-habitat Surveys, updated March 2010
Appendix H Main Body - Calif. Dept. of Water Resources Draft Fall 2009 Interim Flows Monitoring Data Report for the SJRRP
Appendix I : Water Surface Survey Maps and Profiles
Appendix II : Discharge Measurement Maps and ADCP Data Sheets
Appendix III : Reach 2A Section Survey Maps
Appendix IV : SJR Riffle Particle Size Composition Survey Interim Report
Appendix V : Baseline Particle Size Survey for the Tracer Survey; Painted Tracers Count per Bin and Sizes; Baseline Topographic Survey Data (Tracer Sections)
2009-2013 Interim Flow Release Program, Water Quality Monitoring Plan - January 8, 2010
Initial Program Alternatives Report, June 2008
Addendum to PIP for Environmental Justice, January 2008
2006 & 2007
Fisheries Management Technical Work Group Implementation
Environmental Compliance Documents
2007 Program Scoping Meetings and Materials
Contact the
San Joaquin River Restoration Program
Join our Mailing List
August 11, 2010