2/5/16 – Reclamation Releases Final Environmental Documents for San Joaquin River Restoration Program’s Eastside Bypass Conveyance Project, MP-16-026-SJRRP-Eastside-Bypass-Conveyance-Project-Final.pdf (0.1 MiB)
File Category: News Releases
2/4/16 – Reclamation Releases Draft Environmental Document for Transfer or Exchange of Recirculated Restoration Flows to Red Top
2/4/16 – Reclamation Releases Draft Environmental Document for Transfer or Exchange of Recirculated Restoration Flows to Red Top, MP-16-024-SJRRP-Red-Top-Restoration-Flows-draft-EAIS.pdf (0.1 MiB)
1/29/16 – Reclamation Releases Draft Environmental Document for Salmon Conservation and Research Facility Water Supply Infrastructure Project
1/29/16 – Reclamation Releases Draft Environmental Document for Salmon Conservation and Research Facility Water Supply Infrastructure Project, MP-16-021-Draft-EA-FONSI-Water-Suply-for-Salmon-Conservation-Research-Facility-1.pdf (37 KiB)
8/28/14 – SJRRP to Work with Central California Irrigation District on Seepage Projects
8/28/14 – SJRRP to Work with Central California Irrigation District on Seepage Projects, MP-14-163SJRRPCoopAgreementCCID.pdf (24 KiB)
2/3/14 – Draft Environmental Assessment Available for Trap and Transport of Juvenile Salmon in the San Joaquin River
2/3/14 – Draft Environmental Assessment Available for Trap and Transport of Juvenile Salmon in the San Joaquin River, MP-14-114DraftEAAvailableforTrapandTransportofJuvenileSalmonintheSanJoaquinRiver.pdf (0.1 MiB)
4/17/14 – U.S. Fish and Wildlife Service and Reclamation Release Spring-run Chinook Salmon into the San Joaquin River for Study
4/17/14 – U.S. Fish and Wildlife Service and Reclamation Release Spring-run Chinook Salmon into the San Joaquin River for Study, MP-14-068_US-Fish-and-Wildlife-Service-and-Reclamation-Release-Spring-run-Chinook-Salmon-into-the-San-Joaquin-River-for-Study.pdf (0.1 MiB)
3/25/14 – Final Environmental Assessment Available for 2014 Fresno Irrigation District Temporary Pumping Facility
3/25/14 – Final Environmental Assessment Available for 2014 Fresno Irrigation District Temporary Pumping Facility, MP-14-050EnvFresnoIrrigationPumpingFacility.pdf (0.1 MiB)
2/20/14 – Final Environmental Assessment Available for 2014 San Joaquin River Juvenile Salmon Trap and Transport Study
2/20/14 – Final Environmental Assessment Available for 2014 San Joaquin River Juvenile Salmon Trap and Transport Study, MP-14-023EnvDocumentsAvailableforTrapandTransportofJuvSalmoninSJR.pdf (0.1 MiB)
1/31/14 – San Joaquin River Restoration Program to Cease Flows One Month Early
1/31/14 – San Joaquin River Restoration Program to Cease Flows One Month Early, MP-14-012SJRRPCeaseFlows1MonthEarly.pdf (0.1 MiB)
3/4/13 – Reclamation Releases Environmental Documents for Recirculation of Recaptured SJRRP Flows
3/4/13 – Reclamation Releases Environmental Documents for Recirculation of Recaptured SJRRP Flows, MP-13-033RecReleasesEnvDocs4RecircofRecaptured-SJRRPFlows.pdf (0.1 MiB)