Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: News Releases

2/5/16 – Reclamation Releases Final Environmental Documents for San Joaquin River Restoration Program’s Eastside Bypass Conveyance Project

2/5/16 – Reclamation Releases Final Environmental Documents for San Joaquin River Restoration Program’s Eastside Bypass Conveyance Project, MP-16-026-SJRRP-Eastside-Bypass-Conveyance-Project-Final.pdf (0.1 MiB)

2/4/16 – Reclamation Releases Draft Environmental Document for Transfer or Exchange of Recirculated Restoration Flows to Red Top

2/4/16 – Reclamation Releases Draft Environmental Document for Transfer or Exchange of Recirculated Restoration Flows to Red Top, MP-16-024-SJRRP-Red-Top-Restoration-Flows-draft-EAIS.pdf (0.1 MiB)

1/29/16 – Reclamation Releases Draft Environmental Document for Salmon Conservation and Research Facility Water Supply Infrastructure Project

1/29/16 – Reclamation Releases Draft Environmental Document for Salmon Conservation and Research Facility Water Supply Infrastructure Project, MP-16-021-Draft-EA-FONSI-Water-Suply-for-Salmon-Conservation-Research-Facility-1.pdf (37 KiB)

8/28/14 – SJRRP to Work with Central California Irrigation District on Seepage Projects

8/28/14 – SJRRP to Work with Central California Irrigation District on Seepage Projects, MP-14-163SJRRPCoopAgreementCCID.pdf (24 KiB)

2/3/14 – Draft Environmental Assessment Available for Trap and Transport of Juvenile Salmon in the San Joaquin River

2/3/14 – Draft Environmental Assessment Available for Trap and Transport of Juvenile Salmon in the San Joaquin River, MP-14-114DraftEAAvailableforTrapandTransportofJuvenileSalmonintheSanJoaquinRiver.pdf (0.1 MiB)

4/17/14 – U.S. Fish and Wildlife Service and Reclamation Release Spring-run Chinook Salmon into the San Joaquin River for Study

4/17/14 – U.S. Fish and Wildlife Service and Reclamation Release Spring-run Chinook Salmon into the San Joaquin River for Study, MP-14-068_US-Fish-and-Wildlife-Service-and-Reclamation-Release-Spring-run-Chinook-Salmon-into-the-San-Joaquin-River-for-Study.pdf (0.1 MiB)

3/25/14 – Final Environmental Assessment Available for 2014 Fresno Irrigation District Temporary Pumping Facility

3/25/14 – Final Environmental Assessment Available for 2014 Fresno Irrigation District Temporary Pumping Facility, MP-14-050EnvFresnoIrrigationPumpingFacility.pdf (0.1 MiB)

2/20/14 – Final Environmental Assessment Available for 2014 San Joaquin River Juvenile Salmon Trap and Transport Study

2/20/14 – Final Environmental Assessment Available for 2014 San Joaquin River Juvenile Salmon Trap and Transport Study, MP-14-023EnvDocumentsAvailableforTrapandTransportofJuvSalmoninSJR.pdf (0.1 MiB)

1/31/14 – San Joaquin River Restoration Program to Cease Flows One Month Early

1/31/14 – San Joaquin River Restoration Program to Cease Flows One Month Early, MP-14-012SJRRPCeaseFlows1MonthEarly.pdf (0.1 MiB)

3/4/13 – Reclamation Releases Environmental Documents for Recirculation of Recaptured SJRRP Flows

3/4/13 – Reclamation Releases Environmental Documents for Recirculation of Recaptured SJRRP Flows, MP-13-033RecReleasesEnvDocs4RecircofRecaptured-SJRRPFlows.pdf (0.1 MiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back