Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Program-documents

July 2012 Steelhead Monitoring Plan

July 2012 Steelhead Monitoring Plan, SteelheadMonitoringPlanSJRR2012July.pdf (1.1 MiB)

Channel Capacity Report 2014 Restoration Year

Channel Capacity Report 2014 Restoration Year, 20130927_ChannelCapacityReportPublicDraft.pdf (1.2 MiB)

US FWS Addendum

US FWS Addendum, USFWS_Addendum.pdf (1.8 MiB)

May 8 US FWS Addendum(2)

May 8 US FWS Addendum(2), USFWS_Addendum(2).pdf (1.8 MiB)

Final Programmatic Biological Assessment

Final Programmatic Biological Assessment, Final_Programmatic_Biological_Assessment_Reduced.pdf (6.2 MiB)

FY2007-2011 Approved, Obligated and Expended Funds

FY2007-2011 Approved, Obligated and Expended Funds, SJRRPExpensesObligations_FY2007_2011_20120221.pdf (1.0 MiB)

NMFS Addendum

NMFS Addendum, NMFS_Addendum.pdf (3.1 MiB)

Oct 2012 Reach2B Project Description TM

Oct 2012 Reach2B Project Description TM, 2012OctoberReach2BProjDescTMwAttachments.pdf (6.2 MiB)

Dec 2011 FINAL §10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION

Dec 2011 FINAL §10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION, 20122111_10a1aApplication.pdf (1.9 MiB)

Nov 2012 Minimum Floodplan Habitat Area

Nov 2012 Minimum Floodplan Habitat Area, 20121127_MinimumRearingHabitat.pdf (7.2 MiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back