Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Flow Bench Evaluations

April 12, 2013 – increase to 1060 cfs

April 12, 2013 – increase to 1060 cfs, FlowBenchEval20130412.pdf (1.6 MiB)

November 1, 2012 – increase to 750 cfs

November 1, 2012 – increase to 750 cfs, FlowBenchEval20121101.pdf (0.3 MiB)

May 7, 2012 – increase to 1100 cfs

May 7, 2012 – increase to 1100 cfs, FlowBenchEval20120507.pdf (0.4 MiB)

May 2, 2012 – increase to 1000 cfs

May 2, 2012 – increase to 1000 cfs, FlowBenchEval20120502.pdf (0.5 MiB)

Measured Ground Lateral Field Groundwater Surface Gradient Depth Field Depth in Well

Measured Ground Lateral Field Groundwater Surface Gradient Depth Field Depth in Well, FlowBenchEval20120501.pdf (0.4 MiB)

April 23, 2012 – increase to 700 cfs

April 23, 2012 – increase to 700 cfs, FlowBenchEval20120423.pdf (0.4 MiB)

April 17, 2012 – increase to 500 cfs from Friant Dam

April 17, 2012 – increase to 500 cfs from Friant Dam, FlowBenchEval20120417.pdf (0.3 MiB)

January 13, 2012 – increase to 350 cfs from Friant Dam on 1/17/2012

January 13, 2012 – increase to 350 cfs from Friant Dam on 1/17/2012, FlowBenchEval20120113.pdf (0.4 MiB)

November 3, 2011 – increase to 80 cfs past Sack Dam on 11/10

November 3, 2011 – increase to 80 cfs past Sack Dam on 11/10, FlowBenchEval20111103.pdf (0.5 MiB)

October 24, 2011 – increase to 50 cfs past Sack Dam on 10/27

October 24, 2011 – increase to 50 cfs past Sack Dam on 10/27, FlowBenchEval20111024.pdf (0.4 MiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back