Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Interim Flows

Reclamation Central Valley Steelhead Monitoring Plan for the SJRR Area – July 2012

Reclamation Central Valley Steelhead Monitoring Plan for the SJRR Area – July 2012, SteelheadMonitoringPlanSJRR2012July.pdf (1.1 MiB)

NMFS ESA 10(a)1(A) Incidental TakePermit 16608 for the take of California Central Valley Steelhead – January 2012

NMFS ESA 10(a)1(A) Incidental TakePermit 16608 for the take of California Central Valley Steelhead – January 2012, 10a1APermit16608_steelhead_Jan2012-.pdf (0.3 MiB)

Biological Opinion for 10(a)1(A) Incidental Take Permit 16608

Biological Opinion for 10(a)1(A) Incidental Take Permit 16608, 10a1APermit_16608_BO.pdf (0.4 MiB)

NMFS Concurrence Letter – September 30, 2011

NMFS Concurrence Letter – September 30, 2011, SJRRPWY2012IFPjtLtrNMFS20110930.pdf (6.0 MiB)

FWS Concurrence Letter – September 30, 2011

FWS Concurrence Letter – September 30, 2011, FWSSJRRP2012InterimFlowsBO_20110930.pdf (2.9 MiB)

State Water Resources Control Board Order Approving Temporary Transfer and Change – September 30, 2011

State Water Resources Control Board Order Approving Temporary Transfer and Change – September 30, 2011, SWRCBWY12TransferandChangeOrder_093011.pdf (0.5 MiB)

SWRCB Cover Letter – September 30, 2011

SWRCB Cover Letter – September 30, 2011, SWRCB2012OrderTransmittalLtr20110930.pdf (96 KiB)

Draft Recirculation Plan – February 10, 2011

Draft Recirculation Plan – February 10, 2011, 20110210RecapRecircDraftPlan.pdf (0.6 MiB)

Appendix H of the Seepage Management Plan

Appendix H of the Seepage Management Plan, SMP20110221AppH.pdf (2.3 MiB)

Memo requesting public comments on groundwater thresholds

Memo requesting public comments on groundwater thresholds, MemoWY2012ThresholdComments20120110_final.pdf (30 KiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back