Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Fish Passage Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Ra Recommendations

Fall 2013 RA Flow Recommendation 10-22-2013

Fall 2013 RA Flow Recommendation 10-22-2013, Fall_2013_RA_Flow_Recommendation_10-22-2013.pdf (0.3 MiB)

RA 2012 Annual Report

RA 2012 Annual Report, RA 2012 Annual Report.pdf (1.2 MiB)

RA Revised Interim Flow Recommendations

RA Revised Interim Flow Recommendations, RA_Revised_Interim_Flow_Recommendations.pdf (0.1 MiB)

SJRRP Allocation and Default Schedule May 29 Updated

SJRRP Allocation and Default Schedule May 29 Updated, 20130610_SJRRP_Allocation_May_29_Updated_90-percent_Forecast_20130610.pdf (0.1 MiB)

May 10 RA Revised Updated Flow Recommendations

May 10 RA Revised Updated Flow Recommendations, 20130510_RA RevisedUpdated FlowRecMay102013.pdf (0.6 MiB)

SJRRP Allocation May 1 Most Probable Forecast 20130513

SJRRP Allocation May 1 Most Probable Forecast 20130513, 20130513 SJRRP Allocation May 1 Most Probable Forecast 20130513.pdf (0.8 MiB)

May 2 RA INTERIM FLOW PROGRAM RECOMMENDATIONS

May 2 RA INTERIM FLOW PROGRAM RECOMMENDATIONS, UpdatedRAINTERIMFLOWREC20120502.pdf (0.1 MiB)

20130517 Meade To Mitchener Accepting May 17 Allocation And Default Schedule

20130517 Meade To Mitchener Accepting May 17 Allocation And Default Schedule, 20130517_Meade_to_Mitchener_Accepting_May_17_Allocation_and_default_schedule.pdf (0.2 MiB)

2013 RA INTERIM FLOW PROGRAM RECOMMENDATIONS

2013 RA INTERIM FLOW PROGRAM RECOMMENDATIONS, 20130201_RARecommendation.pdf (0.3 MiB)

20130613 Meade To Borah Accepting June 11 Allocation And Default Schedule May 29 Forecast

20130613 Meade To Borah Accepting June 11 Allocation And Default Schedule May 29 Forecast, 20130613_Meade to Borah_Accepting June 11 Allocation and default schedule May 29 Forecast.pdf (0.2 MiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Fish Passage Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back