Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Seepage

Almond Root Zone Study Plan: Updated Phase 2 Report – October 2016

Almond Root Zone Study Plan: Updated Phase 2 Report – October 2016, Phase-2-Draft-Study-Plan_20161011-1.pdf (0.9 MiB)

Almond Root Zone Study Plan: Response to Public Comments on Phase 1 Report – February 2016

Almond Root Zone Study Plan: Response to Public Comments on Phase 1 Report – February 2016, Response-to-Comments-Almond-Phase-1-Study-Feb2016.pdf (0.7 MiB)

Almond Root Zone Study Plan: Phase 1 Report – June 2015

Almond Root Zone Study Plan: Phase 1 Report – June 2015, Phase-1-Almond-Root-Zone-Study-Plan-Admin-Draft-20150629.pdf (1.0 MiB)

SMP Peer Review: Comments and Responses – April 5, 2013

SMP Peer Review: Comments and Responses – April 5, 2013, SMP-Peer-Review-Comments-and-Responses_20130405.pdf (85 KiB)

SMP Peer Review: Peer Review Report – December 10, 2012

SMP Peer Review: Peer Review Report – December 10, 2012, PeerReviewPanel_SMP_Draft_20121210.pdf (1.3 MiB)

Seepage Management Plan: Main Body of SMP

Seepage Management Plan: Main Body of SMP, SMP_Draft_September_2014.pdf (0.7 MiB)

Seepage Management Plan: Appendix A: Seepage Effects of Concern

Seepage Management Plan: Appendix A: Seepage Effects of Concern, SMP_Appendix_A_Draft_September_2014.pdf (0.2 MiB)

Seepage Management Plan: Appendix B: Historic Groundwater Levels and Surface Water Flow

Seepage Management Plan: Appendix B: Historic Groundwater Levels and Surface Water Flow, SMP_Appendix_B_Draft_September_2014.pdf (3.5 MiB)

Seepage Management Plan: Appendix C: Areas Potentially Vulnerable to Seepage Effects

Seepage Management Plan: Appendix C: Areas Potentially Vulnerable to Seepage Effects, SMP_Appendix_C_Draft_September_2014.pdf (7.6 MiB)

Seepage Management Plan: Appendix D: Sediment Texture and Other Data (updated May 2015)

Seepage Management Plan: Appendix D: Sediment Texture and Other Data (updated May 2015), SMP_Appendix_D_Draft_March_2015.pdf (2.6 MiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back