Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Surface Water

River’s End map: 10/4/2009 – 11/6/2009

River's End map: 10/4/2009 – 11/6/2009, SJR09end_River_1106.pdf (0.7 MiB)

River’s End map: 11/16/2009 – 11/20/2009

River's End map: 11/16/2009 – 11/20/2009, SJR09end_River_1120.pdf (0.4 MiB)

River’s End map: 2/25/2010 – 3/2/2010

River's End map: 2/25/2010 – 3/2/2010, SJRiverEnd20100302.pdf (0.7 MiB)

River’s End map: 2/1/2010 – 2/25/2010

River's End map: 2/1/2010 – 2/25/2010, SJRiverEnd20100225.pdf (0.7 MiB)

River’s End map: 2/17/2016 – 7/21/2016 (xlsx)

River's End map: 2/17/2016 – 7/21/2016 (xlsx), EndofSJR_20160721.xlsx (0.2 MiB)

River’s End map: End of SJR 20160715 (zip)

River's End map: End of SJR 20160715 (zip), End-of-SJR-20160715.zip (3 KiB)

River’s End map: Reach 4A: 8/17/2016 – 10/11/2016 (xlsx)

River's End map: Reach 4A: 8/17/2016 – 10/11/2016 (xlsx), Endof-SJR_Oct11_2016.xlsx (0.3 MiB)

River’s End map: End of SJR 20161011 (zip)

River’s End map: End of SJR 20161011 (zip), EndofSJR_2016_Oct11.zip (575 B)

Millerton Daily Operations Report

Millerton Daily Operations Report, sccao_mildop.pdf (27 KiB)

Flow Atlas Maps

Flow Atlas Maps, Flow_20120611.pdf (9.4 MiB)

Posts navigation

Older posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Bypass Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back