- Settlement Related
- Technical Feedback Group Meeting
- Groundwater Report
- Ra Recommendations
- Program-documents
- Reach 2b
- Technical-memoranda
- Landowner Information
- General-outreach
- Data-reporting
- Subsidence Surveys
- Monitoring Analysis Plan
- Reach 4B
- Arroyo Canal and Sack Dam
- Friant-Kern Canal
- Recapture and Recirculation
- Groundwater Banking
- Fisheries Reintroduction
- Field Advisories
- Eblasts
- 2019 Merced NWR Weir Removal Field Advisory (0 B)
- 2019 Merced NWR well installation (0 B)
- 2019-20 Rotary Screwtrap Monitoring (0 B)
- 2019-20 Steelhead Monitoring (0 B)
- 2022 adult spring-run Chinook salmon monitoring (0 B)
- 2023-24 Rotary Screw Trap Field Advisory October 2023 (0 B)
- 2023-24 Steelhead Monitoring Field Advisory (0 B)
- Adult Holding And Spawning Studies (0 B)
- Adult Spring-Run Chinook Salmon Migration and Habitat Study (55 KiB)
- Adult Spring-Run Chinook Salmon Migration and Holding Habitat Study April 2022-August 2022 (0 B)
- Advisory Reach 3 and 4A Hydraulic Conductivity Analyses (45 KiB)
- Aerial Surveys From Friant Dam to the Merced River Confluence and Bypasses (79 KiB)
- Aerial Surveys near the Friant-Kern Canal and Madera Canal (72 KiB)
- August - September 2021 Sack Dam Field Advisory (0 B)
- Bathymetric Surveys (0.1 MiB)
- Bathymetric Surveys in Portions of Reach 4 and the Eastside Bypass (33 KiB)
- Bathymetric Surveys in Reach 2B (48 KiB)
- Bathymetric Surveys in Reach 3 (0.1 MiB)
- Bathymetric Surveys in Reach 3 (41 KiB)
- Benthic Macroinvertebrate Bioassessment (BMI) Study (0.1 MiB)
- Biological and Cultural Resource Field Surveys in Reach 2B (28 KiB)
- Biological and Cultural Resource Field Surveys in Reach 4B (33 KiB)
- Biological and Cultural Resource Field Surveys in Reach 4B (39 KiB)
- Biological field surveys in certain areas of the Eastside Bypass (25 KiB)
- Biological Resource Field Surveys for Small Mammals and Wildlife Habitat in Support of the Mendota Pool Bypass and Reach 2B Improvements Project (35 KiB)
- CA Central Valley Steelhead Monitoring Plan (0.2 MiB)
- California Central Valley Steelhead Monitoring Plan (0 B)
- California Central Valley Steelhead Monitoring Plan December 1, 2020 - April 30, 2021 (0 B)
- California State Lands Commision Verification Survey (33 KiB)
- California State Lands Commission Boundary Surveys (40 KiB)
- California State Lands Commission Verification Survey – Reaches 3 and 4A (28 KiB)
- Central Valley Steelhead Detection and Monitoring Study (0.1 MiB)
- Central Valley Steelhead Monitoring (0.4 MiB)
- Chinook Salmon Egg Survival and Emergence Monitoring (0.1 MiB)
- Chowchilla and Eastside Bypass Surface Sediment Sampling (93 KiB)
- Eastside and Mariposa Bypass Surveys (35 KiB)
- Eastside Bypass and Reach 2A Geotechnical Investigations; Standard and Cone Penetration Tests (0.1 MiB)
- Eastside Bypass Topographic Surveys at the Merced National Wildlife Refuge Upper and Lower Weirs (45 KiB)
- FAQ Spring and Early Fall Biological Resources Surveys (27 KiB)
- FAQ Summer Biological and Cultural Resource Surveys (32 KiB)
- Field Activity Advisory October 9 2012 (56 KiB)
- Field Activity Advisory California Central Valley Spring-run Chinook Salmon Trap and Haul March 1, 2024 – June 30, 2024 (0 B)
- Field Activity Advisory Adult Holding and Spawning Habitat Study June 2020 - February 2021 (0 B)
- Field Activity Advisory California Central Valley Steelhead Monitoring Plan (0 B)
- Field Activity Advisory California Central Valley Steelhead Monitoring Plan December 1, 2022 - April 30, 2023 (0 B)
- Field Activity Advisory Eastside Bypass Improvements Project Removal of the Upper Weir (0 B)
- Field Activity Advisory Monitoring Network Survey (0 B)
- Field Activity Advisory Reach 2B Geophysical Surveys November 2020 (0 B)
- Field Activity Advisory Reach 2B Geotechnical Explorations December 2022 - February 2023 (0 B)
- Field Activity Advisory Reach 2B Geotechnical Explorations November 2021- February 2022 (0 B)
- Field Activity Advisory Reach 3 Geophysical Surveys June 2020 (0 B)
- Field Activity Advisory Reach 3 Geophysical Surveys March 2020 (0 B)
- Field Activity Advisory Rotary Screw Trap Monitoring to Estimate Juvenile Spring-Run Chinook Salmon Production, Survival and Emigration in the San Joaquin River Restoration Area (0 B)
- Field Activity Advisory Spawning Sucess Aug-Dec 2024 (0 B)
- Field Activity Advisory Spring-Run Chinook Salmon Juveniles Scheduled for Release February 14 - March 31, 2022 (0 B)
- Field Activity Advisory Spring-Run Chinook Salmon Yearling Release December 8, 2022 (0 B)
- Field Activity Advisory Telemetry of Juvenile Natural Origin Spring-Run Chinook Salmon through the San Joaquin River Restoration Area February 1, 2021 - July 30, 2021 (0 B)
- Field Activity Advisory Wellpoint Installations February 2020 (0 B)
- Field Advisory Adult Spring-Run Chinook Salmon Holding and Spawning Habitat Study June – December 2018 (0.2 MiB)
- Field Advisory California Central Valley Steelhead Monitoring Plan (0.1 MiB)
- Field Advisory explaining the PIT Tag Study (74 KiB)
- Field Advisory Juvenile Chinook Salmon Monitoring (0.3 MiB)
- Field Advisory Spring-run Juvenile Releases 2018 (0.1 MiB)
- Field Advisory Spring-Run Juvenile Releases 2019 SJRRP (0 B)
- Field Advisory Spring-run Yearling Release (0 B)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- Field Advisory Spring-run Yearling Release Dec 2023 (0 B)
- Field Investigations in preparation for water flow monitoring activities (0.1 MiB)
- Field-Advisory-for-LiDAR 6 (0 B)
- Fish Telemetry Study for juvenile fall-run Chinook salmon (50 KiB)
- Fish Telemetry Study to track fish movement around bypasses, canals, and captured mine pit areas. (49 KiB)
- Frequently Asked Questions (34 KiB)
- Frequently Asked Questions about Soil Salinity Surveys (36 KiB)
- Frequently Asked Questions Fact Sheet (42 KiB)
- Groundwater Monitoring Well Maintenance (replacing covers) (32 KiB)
- Groundwater Seepage Monitoring Well Installation (34 KiB)
- Highway 41 (0.1 MiB)
- Hydraulic Conductivity Analysis (0.4 MiB)
- Hydraulics and Sedimentation Survey (mapping the river or channel bottoms in Reach 4B and the Eastside Bypass) (0.2 MiB)
- Installing Groundwater Monitoring Wells (32 KiB)
- Invasive Aquatic Species Sampling (68 KiB)
- Invasive Species Sampling (0.1 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.1 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (quarterly) (0.2 MiB)
- July 2019 - Subsidence Field Advisory (0 B)
- Juvenile Chinook Salmon Floodplain Production Study Field Advisory (83 KiB)
- Juvenile Fall-run Chinook Salmon Migration and Survival Study (59 KiB)
- Juvenile Salmon Trap and Transport Study (0.1 MiB)
- Juvenile Spring-Run Chinook Salmon Scheduled for Release (0.2 MiB)
- Kangaroo Rat Trapping in Reach 4A (63 KiB)
- Kangaroo Rat Trapping in Reach 4A (63 KiB)
- Levee and Ground Topographic Surveys by Dept. of Water Resources Contractor, Provost & Pritchard (61 KiB)
- Levee Penetration Survey (0.2 MiB)
- Levee Stability Geologic Investigations (46 KiB)
- Lost Lake (0.1 MiB)
- Maps of aerial survey areas: Friant-Kern Canal, part 1 (6.8 MiB)
- Maps of aerial survey areas: Friant-Kern Canal, part 2 (6.3 MiB)
- Maps of aerial survey areas: Madera Canal (1.1 MiB)
- March 26, 2019 Pre-construction Surveys Field Advisory (0 B)
- Mendota Pool Bypass and Reach 2B Channel Improvements Project – Test Pit Surveys for Potential Borrow Materials (53 KiB)
- Mendota Pool Sediment Sampling Surveys (0.2 MiB)
- Middle Eastside Bypass SJLEP Geotechnical Exploration (36 KiB)
- MLT Aquifer Testing SJN (0 B)
- MLT Geotechnical Surveys May 28 - June 3, 2020 (0 B)
- MLT Pre-construction Surveys Draft Field Advisory_March_19 (0.1 MiB)
- MLT Repair Field Advisory 050119 (0 B)
- Mowry Bridge Pre-Construction Activities Field Activity Advisory (0 B)
- Noise Surveys for the Mendota Pool Bypass and Reach 2B Improvements Project (0.2 MiB)
- October 1, 2020 - June 30, 2021 Rotary Screw Trap Monitoring Field Activity Advisory (0 B)
- PIT Tag Monitoring Evaluation and Site-specific Technology Assessment (86 KiB)
- Predator Assessment (0.3 MiB)
- Predator Assessment (0.8 MiB)
- Predator Assessment from River Mile 260 to River Mile 231 (map included in advisory) (0.3 MiB)
- Project and Non-Project Geologic Investigations (0.2 MiB)
- Project Vegetation Survey for Channel Hydraulic Model Development (0.3 MiB)
- Reach 1A Bathymetric Surveys (2.0 MiB)
- Reach 1B/2A_Monitoring Advisory (0.1 MiB)
- Reach 2B Geotechnical Field Advisory April 2020 (0 B)
- Reach 2B Giant Gartner Snake Survey and Trapping (4.7 MiB)
- Reach 2B Levees and Channel Improvements Geotechnical Investigations Field Advisory (0.4 MiB)
- Reach 2B Maps: Map 1 of 3 (2.1 MiB)
- Reach 2B Maps: Map 2 of 3 (2.6 MiB)
- Reach 2B Maps: Map 3 of 3 (1.2 MiB)
- Reach 3 Levee Survey Field Advisory (0 B)
- Reach 3 Maps: Map 1 of 6 (1.8 MiB)
- Reach 3 Maps: Map 2 of 6 (1.1 MiB)
- Reach 3 Maps: Map 3 of 6 (2.6 MiB)
- Reach 3 Maps: Map 4 of 6 (1.6 MiB)
- Reach 3 Maps: Map 5 of 6 (1.6 MiB)
- Reach 3 Maps: Map 6 of 6 (2.9 MiB)
- Reach 4A Topographic Surveys by Dept. of Water Resources and Provost & Pritchard (0.2 MiB)
- Reach 4B Project Baseline Vegetation Survey and Eastside and Mariposa Bypasses Vegetation Mapping (42 KiB)
- Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project Traffic Surveys (38 KiB)
- Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project Traffic Surveys (51 KiB)
- Reach 4B, Eastside, and Mariposa Bypasses Geotechnical Investigations – Standard and Cone Penetration Tests (1.1 MiB)
- Reach 4B1 Maps: Map 1 of 5 (1.0 MiB)
- Reach 4B1 Maps: Map 2 of 5 (1.4 MiB)
- Reach 4B1 Maps: Map 3 of 5 (0.3 MiB)
- Reach 4B1 Maps: Map 4 of 5 (1.9 MiB)
- Reach 4B1 Maps: Map 5 of 5 (1.2 MiB)
- Reach 5, 4B2 and Lower Eastside Bypass Topographic Surveys (0.3 MiB)
- Reach O Levee Improvements Field Activity Advisory (0 B)
- Redd & Carcass Survey, Egg Survival & Emergence Study, and Redd Incubation Environment Study (0.2 MiB)
- Redd & Carcass Survey, Egg Survival & Emergence Study, and Redd Incubation Environment Study (0.3 MiB)
- Redd and Carcass Survey and Egg Survival and Emergence Study (0.2 MiB)
- Redd and Carcass Surveys to Estimate Adult Spring-Run Chinook Salmon Spawning Success in the San Joaquin River Restoration Area (0 B)
- Resistivity Surveys (0.1 MiB)
- Revegetation Reconnaissance Surveys (0.1 MiB)
- Riparian Habitat Mapping Project (0.2 MiB)
- Rotary Screw Trap SJRRP Field Advisory November 2018 (0 B)
- Salmon Egg Survival and Emergence (0.1 MiB)
- Salmon Redd Monitoring and Carcass Recovery Surveys (0 B)
- San Joaquin River Inventory and Monitoring of Fish Abundance and Diversity (0.7 MiB)
- San Joaquin River Inventory and Monitoring of Fish Abundance and Diversity (0.5 MiB)
- San Joaquin River Juvenile Fall-run Salmon Trap and Transport Study (0.4 MiB)
- San Joaquin River Juvenile Salmon Trap and Transport Study (0.3 MiB)
- San Joaquin River Juvenile Salmon Trap Efficiency Study (0.5 MiB)
- San Joaquin River Juvenile Salmon Trap Efficiency Study (0.3 MiB)
- San Joaquin River PIT Tag Monitoring of Fall-run Juvenile Salmon Releases (0.3 MiB)
- San Joaquin River Rotary Screw Trap Study (75 KiB)
- San Joaquin River Spring-Run Chinook Salmon Monitoring Study (0.3 MiB)
- San Mateo Crossing and Floodplain areas (0.1 MiB)
- Scout Island (0.1 MiB)
- Site visits for potential seepage well locations near the SJ River (25 KiB)
- SJRRP Advisory Monitoring And Emergent Studies Oct. 2021 - April 2022 (0 B)
- SJRRP Field Advisory Spring-run Yearling Release (0.1 MiB)
- Skaggs Bridge Park Proximity (94 KiB)
- Soil Salinity Surveys in Reaches 2B, 3, and 4 (31 KiB)
- Soil Surveys, Hydraulic Conductivity and Staff Gage Surveys (0.4 MiB)
- Spring-Run Chinook Salmon Egg Survival, Emergence and Habitat Study (0 B)
- Spring-Run Chinook Salmon Monitoring Study (0.6 MiB)
- Spring-run Yearling Release December 2019 (0 B)
- Subsidence Monitoring Survey (1.0 MiB)
- Subsidence Monitoring Survey (1.0 MiB)
- Summer Biological and Cultural Resource Surveys in Reach 2B (25 KiB)
- Temperature Monitoring – installation of sensors (32 KiB)
- Terrestrial and Aquatic Invertebrate Sampling (38 KiB)
- Top-of-levee Topographic Surveys Field Advisory (0.8 MiB)
- Trap and Haul Field Advisory (0.3 MiB)
- Trap and Haul Field Advisory (0.2 MiB)
- Trap and Haul of Adult Fall-run Chinook Salmon at and above the Hills Ferry Barrier (near the confluence of the Merced River) (0.2 MiB)
- Trap and Transport and Streamside Spawning of Adult Fall-run Chinook Salmon (0.4 MiB)
- Trap and Transport and Streamside Spawning of Adult Fall-run Chinook Salmon (0.5 MiB)
- Update on Field Activities for Juvenile Fall-run Chinook Salmon Releases (60 KiB)
- Updated Field Advisory on the Study – November 20, 2012 (0.1 MiB)
- Updated Field Advisory on the Study – November 20, 2012 (0.1 MiB)
- Updated PIT Tag Monitoring of Fall-run Juvenile Salmon Releases (74 KiB)
- Updated San Joaquin River Rotary Screw Trap Study (72 KiB)
- Updated Trap and Transport and Streamside Spawning of Adult Fall-run Chinook Salmon (0.1 MiB)
- Vegetation Monitoring Study (70 KiB)
- Water Quality Sampling Survey (74 KiB)
- Waters of the United States Mapping and Wetland Investigations (40 KiB)
- Eblasts
- News Releases
- Seepage
- Water Quality
- Subsidence Monitoring
- Restoration Goals Meeting Archives
- Surface Water
- Groundwater Monitoring
- Science Meeting
- Habitat
- Data Download
- Final SJR Background Report
- 10 Percent Design Report 03 26 2021 (0 B)
- 20140131 SCTFG Presentation FINAL (21.9 MiB)
- 20140820 SCTFG Presentation Draft Print (14.6 MiB)
- 20141015 R2B October AgendaFINAL (1) (38 KiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA (2.5 MiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA(2) (2.5 MiB)
- 20150127 R2B TechMtgAgendaFINAL (45 KiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150708 MPB-DraftDocMtgAgendaFresno LosBanos0626 (0.2 MiB)
- 20150710 MPB-DraftDocMtgAgendaSacramento0626 (45 KiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeB Map (2.6 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeD Map (2.6 MiB)
- 20150812 R4B Agenda (50 KiB)
- 20150812 SJRRP R2B Presentation1 (3.3 MiB)
- 2016-SJRRP-Science-Meeting Abstract-Form (0.2 MiB)
- 2016.02.12 MAP-Schedule-and-Objectives-for-2017-Memo (0.5 MiB)
- 20160318 SJRRP-Restoration-Allocation Final (0.5 MiB)
- 20160322 Field-Advisory-KangarooRatTrapping (63 KiB)
- 20160629 FAA SJR AdultHoldingFINAL (60 KiB)
- 2017-MAP-Pre-Proposal-Form (0.1 MiB)
- 2018 Funding Constrained Framework For Implementation (0.9 MiB)
- 20190228 SJRRP Flow Bench Evaluation FINAL (0 B)
- 20200207 SJRRP Restoration Allocation Update (0 B)
- 2020–21 Juvenile Salmon RST FINAL (2024-10-01) 508 (0 B)
- 2022-04-emily-thomas-writeup (0 B)
- 2023 Tuel Et Al It Isnt Easy Being Green In The San Joaquin Poster (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 3 Tulare FactSheet Draft (1) (2.8 MiB)
- Agenda SCTFG 20140820 (0.2 MiB)
- Appendix A - Design Drawings Reduced (0 B)
- Appendix A Foundation For The Funding Constrained Framework-508 (0.5 MiB)
- Appendix B 2015 Framework for Implementation (5.8 MiB)
- Appendix B Analysis Of Physical Flow Characteristics-508 (6.6 MiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Federal Obligations And Expenditures Through Fiscal Year 2016 (0.2 MiB)
- Appendix C Rch2A 7-17-17 508 (2.3 MiB)
- Appendix D Project And Activity Cost Summary (0.1 MiB)
- Appendix E Mendota Pool Bypass And Reach 2B Improvements Draft Schedule-508 (44 KiB)
- April 21, 2023 - SJRRP Operations 2023 V.41q (6.8 MiB)
- Bond Reporting - Copy Draft 1 (26 KiB)
- CCR2017 Final-draft Appendix-B 508 (15.0 MiB)
- CCR2019 Final Appendix A (0 B)
- Channel Capacity Report 2018 Appendix A (0.2 MiB)
- Channel Capacity Report 2018- Appendix C Reach 2A (2.3 MiB)
- Channel Capacity Report 2018--Appendix B Channel Capacity Update Reach2A 2B (1.6 MiB)
- Creek Fire Bass Lake Clovis Fire Dept. (0.2 MiB)
- Cropped Refuge Pano (2.1 MiB)
- CV SMP Poster 2012 23 Final 042823 (0 B)
- December 2023 ArcGIS Data (0.1 MiB)
- DRAFT DWR BOR Data Summary 070314 (3.3 MiB)
- DRAFT SCTFG Agenda 20140131UPDATE (0.1 MiB)
- DWR SJRRP TFG 082014f (1.3 MiB)
- Effects of a Riparian Forest on Water Temperatures in the Restoration Area 2014 (0 B)
- Emergence Poster 2023 SJRRP Meeting (0 B)
- EndofSJR 20160309 (0.2 MiB)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- FINAL SCTFG Meeting Summary 082014 (0.2 MiB)
- Framework Map - Large (1.7 MiB)
- Friant NASA ASO Poster (0.3 MiB)
- Fyke Net Install (2.0 MiB)
- How Is Airborne Snow Observatory Data Being Utilized V6 (0.8 MiB)
- June 23, 2023 - SJRRP Operations 2023v.41r (5.3 MiB)
- May 26, 2023 - SJRRP Operations 2023 (5.2 MiB)
- MCFS DRAFT May27 Meeting Summary Final (52 KiB)
- ML SJRRP Presentation (0 B)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- Reach1A UpdatedModel Gdb (61.9 MiB)
- Refuge Weir Pano II (0.7 MiB)
- Reynaud AreMacrophytesPositively (0 B)
- Riparian Microclimate Study 2014 (0 B)
- River Rock Mitigation Poster - Final (0 B)
- San Joaquin 2017 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Slough Control Structure II (0.7 MiB)
- SCARF Rendering (0.1 MiB)
- SCTFG 20231208 Agenda (0 B)
- SCTFG Meeting Summary 20140131 (0.2 MiB)
- Sherman Et Al SJRRP2023 Poster (0 B)
- SJRR Org Chart Color FINAL 4-30-07 (0.2 MiB)
- SJRRP 2020 Virtual Science Meeting Agenda (0 B)
- SJRRP 2023Mtg Agenda (0 B)
- SJRRP 2023Mtg Agenda FINAL (0 B)
- SJRRP AnnualReport 2019-2020 508 (0 B)
- SJRRP ATH Poster Draft ZS 42823 (0 B)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Fish Habitat Study - Final 2012 (1) (2.9 MiB)
- SJRRP IPAR Final 062708 (1.9 MiB)
- SJRRP Operations Apr 11 2024 (6.2 MiB)
- SJRRP Operations Aug 10 2023 (6.4 MiB)
- SJRRP Operations Aug 9 2024 (5.9 MiB)
- SJRRP Operations Dec 31 2023 (6.6 MiB)
- SJRRP Operations July 12 2024 (7.2 MiB)
- SJRRP Operations Jun 21 2024 (7.2 MiB)
- SJRRP Operations May 17 2024 (6.3 MiB)
- SJRRP Operations Nov 17 2023 (6.5 MiB)
- SJRRP Operations Oct 20 2023 (6.5 MiB)
- SJRRP Operations Sept 18 2023 (6.4 MiB)
- SJRRP PIP 4-27-07 Final (0.3 MiB)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRPDraftPEISRLibrarys4web (22 KiB)
- SJRRPExpensesObligations FY2007 2011 20120221 (1.0 MiB)
- SJRRPWeeklyGWRept 01 03 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 06 25 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 06 27 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 07 09 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 10 29 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 11 11 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(2) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(3) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(4) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(5) (0.2 MiB)
- SJRTemperature Model 20070510 Final (2.0 MiB)
- SMP Appendix C Attachment September 2014 (0 B)
- SteelheadMonitoringPlanSJRR2012July (1.1 MiB)
- StockSelectionStrategy2010Nov (1.7 MiB)
- Striped Bass In The San Joaquin Final 2024 (0 B)
- Striped Bass Presentation Final (0 B)
- Test (0.1 MiB)
- Third Parties Mou 022607 (0.2 MiB)
- UpdatedAppendixB 20150625 (5.9 MiB)
- Water Safety (16 KiB)
- WQ Report SMP 201212 (2.7 MiB)
- WQ Report SMP 201305 (2.7 MiB)
- WQ Report SMP 201512 (2.7 MiB)
- WQ Report SMP 201703 (1.0 MiB)
- WQ Report SMP 201805 (0 B)
- WQ SMP Tables and Data - Summary (0.3 MiB)